January 1, 2008
welcomes a nearly completed exterior and nears the rough-in
inspection points for the framing, plumbing, electric and HVAC.
VaDance Studio progress
continues.......
The new facility completes the halfway point by the end of 2007.
The exterior is almost finished. The brick work was done by
Juan Puente and his crew. Winston Mann did the roof, while
Jake Burnopp of Burnopp Metal finishes off the trim and guttering
work. Jamie at Appomattox Glass assists in the storefront
window selections. The interior work is nearing the half way
point with Jim Quattlebaum (Plumbing), Robert Moore (HVAC) and
Buster Beasley (Electrician) staying diligent. |
|
|
|
Rus Burnette continues with framing and
roof work. Below, Rus is "on the roof". |
 |
|
|
Rus does the
prep work for the roof and Winston Mann and his crew get the
building under roof during the first weeks in December 2007.
|
 |
| The interior work
continues with rough plumbing by Jim Quattlebaum and crew.
The HVAC rough-in begins in December with Robert Moore of
Moore's Heating & Cooling. The rough-in work continues
with Buster Bealsey of Beasley Electric doing the electric
related work. |
| |
 |
| Jim Quattlebaum
above inspecting the job site. |
|
|
 |
| Buster's sign above. Below is one
of the Beasley electricians laying wire into the ICF walls. |
 |
|
|
|
ICF walls are selected by Steve and Donna as an
innovative and "green" building product. The
exterior walls are already well insulated by the use of the ICF
wall system. The interior walls are pre-insulated and only
the stick built portion and the ceiling and roof need additional
insulation. |
|
|
 |
| Charlie Padgett designs
and supervises the sidewalk for the new building. Paving
will follow as soon as weather permits. The sidewalk is
poured the 2nd week of January during a short warm spell. |
| |
|
The addition of
a 5,000 square foot dance and office space will open in the
first quarter of 2008.
Stay
Tuned for the latest updates........ |
|
|